Mining Rig: Difference between revisions

added lore with reference
m moved lore to Vodel article
Line 15: Line 15:


On one side of the mining rig is a charging port for manual calibration. You can activate it by approaching the mining rig [[On Foot|on foot]] and calibrate it by using the [[Energy Link]].
On one side of the mining rig is a charging port for manual calibration. You can activate it by approaching the mining rig [[On Foot|on foot]] and calibrate it by using the [[Energy Link]].
== Lore ==
On 17 Sep 3312, [[Vodel]] and [[Wreaken Corporation|Wreaken Mining]] made a joint press statement that the Rhino and surface mining trials were a resounding success.<ref name=":0">[https://www.elitedangerous.com/news/galnet/srv-and-surface-mining-trials-deemed-resounding-success SRV and Surface Mining Trials Deemed Resounding Success] - 17 September 2026 - Elite Dangerous</ref> Dr. Ben Curtis, Chief Geologist of Wreaken Mining, added "The amount of minerals received as a result of the new surface mining rig was unprecedented,"<ref name=":0" /> "My research has been proven, and I cannot wait to see what this new technology will yield in time."<ref name=":0" /> Vodel and Wreaken hope that the Rhino and the rig will usher in a new era of surface mining.<ref name=":0" />


== Gallery ==
== Gallery ==