Hauler: Difference between revisions

Added insurance cost.
Corrected insurance and cost
Line 10: Line 10:
|-
|-
|Cost:
|Cost:
|22,805 CR
|68,000 Cr
|-
|-
|Insurance:
|Insurance:
|2,636 CR
|3,400 Cr
|-
|-
|Type:
|Type: